How to make a dry screed floor with their hands

When buying an apartment often becomes acutely the problem of repair of new home. This question is especially concerned about those who had the good fortune to purchase a square meter in the new building. As a rule, after purchase of such apartments necessary to carry out serious repair work, because housing is initially reminiscent of a bare concrete box.

Often the most exciting question before the newly minted owners becomes the floor. It is not surprising, because in order to bring it into a normal residential appearance required to perform the screed. What is it? How it is done?

What is a screed? ↑

How to make a dry screed floor with their handsIn fact, this alignment of sex, which is of several types – in fact, the screed and self-leveling floor leveling. The composition of the underlayment including mineral filler with grains not more than 0.5 cm and a cement base. The height alignment of floor with the screed to vary between 3-15 cm.

There are two main types of screed: dry and wet. Consider in more detail the dry.

Dry screed floor has several positive aspects to work with and well suited for premises: fast speed of packing, provides warmth and sound insulation, hides the communication and make the floor throughout the apartment on one level.

In addition, when working with dry screed has the advantages such as:

  • cushy job;
  • less labor-intensive than cement.
  • no need to wait for long drying time – after several hours it is possible to carry out other works;
  • it is possible to work even in winter;
  • due to the small weight, dry screed can be used in older homes, because of the small load bearing structures;

How to make a dry screed floor with their handsUnfortunately, there are some disadvantages that are worth to mention:

  • this floor absorbs moisture quickly, therefore requires additional paroizoljatsii when placed in a bathroom or kitchen and laying a waterproofing layer and processing of fire retardant compounds;
  • Paul takes from 10 to 15 cm in height, which is not good will affect areas with low ceilings. To use it it is best if the ceiling height 3 m.

At the same time the technology is simple enough and you can save additionally on the laying of the floor and to make this work with their hands.

Dry screed with their hands ↑

This technology is a stacking of the sheet elements at a certain mound of insulation grain material. They are quite simple and easy, this kind of screed is much easier to do with your hands.

Video: how does the process of dry screeds can be viewed here:

Before you start, you need to clean the floor from debris and dirt. Cleaning should be done without moisture, can be only slightly dampened if there is a lot of dust.

It is important! If the floor is uneven and you can see gaps between plates, be sure to seal them with a special repair mixes. It is not necessary to hope that the dry screed close them – this will entail negative consequences in the further operation.

The next step is the mandatory laying of the waterproofing layer. It needs to be as thoroughly as possible. The fact is that if water gets inside the floor will follow the deformation and in the end, you will have to do a screed.

Waterproofing is done by plastic film. She laid on the floor and is attached only at the wall at 5 cm from the floor. Next you need to lay on the perimeter of the room strips of mineral wool or polyethylene over the layer of plastic film. This is done for quality of sound insulation and shock absorption.

How to make a dry screed floor with their hands

You then lay the screed itself. Best of all, if it’s particles of expanded clay fraction from 1 to 5 mm. due to the difference in diameter they perfectly cover the surface of a smooth layer. For leveling layer, it is desirable again to use the beacons. The layer should be put in such a way as to leave margin of 2.5 cm between the leaf surfaces. The alignment starts from the farthest corner and ends near the entrance.

The surface of the dry screed is a gypsum sheets. This material is much stronger than drywall. The connection happens between the sheets with folded edges, which are glued with special adhesive mass and is secured with screws.

We must start from the front door. In order not to damage the smooth surface, consisting of clay and sand, should be installed on top of the first sheet to overlay another, which can become to continue. All the joints of the plates of the scroll screws.

After all the sheets are laid, you will be able to carefully cut the protruding edge of the plastic film. Further, it is possible to carry out additional activities, depending on what you are going to do (heated floors, etc.).

How to make a dry screed floor with their hands

Useful tips ↑

  • if dry floor screed is done in the kitchen or in the bathroom, it is advisable to be safe and to make another layer of waterproofing.
  • if you plan on top of the dry screed to make laying tile – it can be done directly on the leaf surface with glue.
  • if you want over dry the screed to lay linoleum or self-leveling floor, the joints between the sheets should be closed by putty or similar material.
Please note! Dry screed expanded clay is one entry – for one day. However it is not necessary to proceed immediately to the subsequent finishing work, because you can inadvertently harm it. Let the night, so the glue is completely dry, and the material fully ulezhalis.